Power Systems Recovery home home press room contact
Power Systems Recovery Power Systems Recovery
power plant generator reclamation condenser retubing process qualifications
Power Systems Recovery
 
Power Systems Recovery
 
Copper, Copper Nickel, Brass, Titanium. Inconel, Monel, and Stainless Steel Tubes
 
Step 1:

Open the condenser-remove the water boxes and/ or cover plates on both sides.
Power Systems Recovery Power Systems Recovery
 
Step 2:

Cut the tubes behind the tube sheet on one end of the condenser.
Power Systems Recovery Power Systems Recovery
 
Step 3:

Place water sprinklers over tube bank and the install trolley beam.
Power Systems Recovery Power Systems Recovery
 
Step 4:

Pull the tubes out 6 inches from the face of the tube sheet on the opposite side of the tube cut. Stubs can also be removed with the collet puller.
Power Systems Recovery Power Systems Recovery
 
Step 5:

Pull the entire tube from the tube sheet- the PSR Extractor also flattens the tube as it is removed. Gin Pole- shown on the right.
Power Systems Recovery Power Systems Recovery
 
Step 6:

Chops the tubes into small pieces which is a highly desirable, compact form of scrap.
Power Systems Recovery Power Systems Recovery
 
Have Questions?

Need technical assistance or equipment pricing?
Please Contact us at (805)565-9025.